In a copper refinery process the tankhouse cranes are one key
element in improving the plant performance. While the cranes move
anode and cathode plates the electrolytic process must be stopped.
Every second saved in crane operations means increased
production.
ICRAS load sway control was installed 1994 into this 20 ton overhead
crane at Outokumpu Harjavalta Metals Ltd copper refinery in Pori,
Finland. ICRAS decreases the load positioning time several seconds.
Since the crane is positioned 340 times every day a few seconds
saving for each cycle means significantly reduced crane operating
time and increased production rate. At the same time operator
fatigue is decreased. Operators also report improved working
conditions. ICRAS system has now operated 4 years with extremely
high availability.
Innocrane has developed with Outokumpu Wenmec Ltd several
automation tools to improve performance of tankhouse cranes. |
 |

|
|
|
|
|